News Categories
GenCost: Annual insights into the cost of future electricity generation in Australia
2 April 2024
2023-24 GenCost consultation draft released
The drafting considers inputs sourced on real-time engineering and construction cost data points in Australia, as well as overseas parallels, information from equipment manufacturers, software and literature. Key points in the current draft are:
- Pre-2030 integration costs now included.
- Variable renewables still found to have the lowest cost range of any new-build technology.
- Inflation impacts easing.
- Large scale solar falls.
- Pressure remains on gas, onshore wind and nuclear SMR
- To read more click here